These key terms have been designed as a reference tool when you need more detail on a specific topic.
The register maintained by Ofgem through which FIT generators with ROO-FIT installations apply for accreditation and record any changes to it.
Solar PV or wind installations with a DNC over 50 kW and up to a TIC of 5 MW, and anaerobic digestion or hydro installations with a TIC up to 5MW