The maximum capacity at which the installation could be operated for a sustained period without damaging it (assuming the source of power used by it to generate electricity was available to it without interruption) minus the amount of electricity that is consumed by the installation.
DNC is used to determine whether an installation classes as MCS-FIT or ROO-FIT.