Scottish Power - Capacity Market Rules change proposal 3
Change Proposal
This submission proposes to extend the rules on permitted connection arrangements for an Existing Generating CMU that is a Transmission CMU so that alternatives to conventional TEC that are thought adequate by the SO can prequalify. An addition to Rule 3.6.3 is proposed.