National Grid - Capacity Market Rules CP191

Change Proposal
Publication date

This proposal seeks to amend the de-rating factor calculation under Rule 2.3.5 so that Distribution Connected station data is utilised to better capture distribution-level scenarios.

Change proposal status
Closed (rejected)

Proposal rules area

Auction Guidelines and De-rating

Proposal organisation

National Grid Electricity Transmission