National Grid - Capacity Market Rules change proposal 17

Change Proposal
Publication date

This proposal from National Grid would remove the requirements to provide metering information and bank details to the Delivery Body during prequalification. Instead it would replace this with requirements to provide such information direct to the Settlement Body after prequalification. Amendments to Rules 3.4.3(a)(i); 3.6.4; 3.9.4; 3.4.1(d) are proposed.

Change proposal status
Closed (accepted)

Proposal rules area

Prequalification Information

Proposal organisation

National Grid Electricity Transmission