Minded to decision assignment of TSO Obligations under three EU Network Codes

Correspondence and other
Publication date
Industry sector
Generation and Wholesale Market

Our minded to decision to assign Transmission System Operator (TSO) obligations under the COMMISSION REGULATION (EU) 2017/2195 establishing a guideline on electricity balancing and COMMISSION REGULATION (EU) 2017/2196 establishing a network code on electricity emergency and restoration, as well as our minded to decision on amending our assignment of obligations under Article 70(1) of COMMISSION REGULATION (EU) 2017/1485 establishing a guideline on electricity transmission system operation within GB.

The documents setting out our minded to decision are:

  • The minded to decision letter
  • Annex 1: The GB TSO assignment of obligations for the Emergency and Restoration Code
  • Annex 2: The GB TSO assignment of obligations for the Electricity Balanding Guideline
  • Annex 3: BEIS letter authorising Ofgem to carry out the TSO allocation of tasks under the Electricity Balancing Guideline, the Emergency and Restoration Network Code, and the System Operation Guideline.