E.ON - Capacity Market Rules change proposal 3

Change Proposal
Publication date

This proposal from E.ON would substitute the current drafting of Rule 4.4.2 (f) with drafting that requires that prequalified Existing Generating CMUs show that physically generated net output nominated pursuant to Rule 3.6.1 is equal to or greater than the Connection Capacity specified by the Applicant. Currently Rule 4.4.2 (f) requires prevents prequalification of Existing Generating CMUs that display physically generated net output that does not exceed Anticipated De-rated Capacity.

Change proposal status
Closed (rejected)

Proposal rules area

Determination of eligibility

Proposal organisation

E.ON