Energy UK – Capacity Market Rules CP126
Change Proposal
This proposal from Energy UK would clarify that when a Refurbishing CMU’s connection capacity is equal its Pre-Refurbishment connection capacity, it does not have to be issued with a Final Operational Notification (FON) or an Interim Operational Notification (ION) for it to be classed as ‘Operational’. It would also remove the requirement for this type of CMU to notify the Delivery Body when an FON or ION is issued.