Electricity Settlements Company - Capacity Market Rules CP303
Change Proposal
To allow the use of Metering Equipment that does not meet the minimum accuracy classes specified in Schedule 7 (Bespoke Technical Requirements) where it can be demonstrated that the Overall Accuracy of the Metering Systems is within the allowed limits.