ECO2 District Heating Pre-Conditions (Insulation): Technical Report Template
Guidance
For premises in a multi-storey building that do not include the top floor and are connected to a district heating system (DHS) under CERO or CSCO, pre-condition 2 must be met. This technical report can be used to evidence instances where there are technical reasons why a cavity cannot be filled. In such instances, this report will satisfy pre-condition 2 for the premises it relates to. This report can also be used to evidence that walls are of solid wall construction.