Consultation on further detailed regime parameters for the Offshore Hybrid Asset pilot scheme

Consultation
  • Upcoming
  • Open
  • Closed (awaiting decision)
  • Closed (with decision)
Publication date
Closed date
Industry sector
Offshore Transmission Network

We are consulting on further detailed regime parameters for the Offshore Hybrid Asset (OHA) pilot scheme.

These are additional to the high-level regime parameters included in section 7 and Appendix 1 of our decision on the Regulatory Framework for the Non-Standard Interconnectors (NSIs) of the OHA pilot scheme of 8 February 2024. 

The OHA pilot scheme comprises the proposed LionLink and Nautilus Non-Standard Interconnectors, which are to run from the United Kingdom to offshore converter stations, linked to offshore wind farms, in Netherlands and Belgian waters respectively.