National Grid - Capacity Market Rules change proposal 10
Change Proposal
This submission proposes to amend several aspects within Rules area 3 (Prequalification Information). The proposed changes would substitute the requirement for a description of a CMU with that for the CMU’s address and/or grid reference(s); they would modify the Rules to state that the applicant for a Refurbishing CMU may be the despatch controller; they would clarify that the Rules relating to setting Connection Capacity which apply to existing generators also apply to pre-refurbishment elements of Refurbishing CMUs; they would also clarify the requirement to state the 24 month period which includes the settlement periods in which the CMU delivered its highest output.