DECC - Capacity Market Rules CP109
Change Proposal
This proposal from DECC would remove metering related requirements (with the exception of MPANs) from the prequalification stage to after the Capacity Auction. DECC consider applicants should only be required to submit information as part of their application which is materially significant to determining their prequalification status.