ADE – Capacity Market Rules CP100

Change Proposal
Publication date

This proposal from ADE seeks to ensure that all CMUs are able to transfer the entire volume of their capacity obligation to another CMU. ADE believes that the existing wording of Rule 9.2.4 may limit the ability of DSR and embedded generation to do this.

Change proposal status
Closed (accepted)

Proposal rules area

Transfer of Capacity Obligations

Proposal organisation

ADE