ADE – Capacity Market Rules CP100
Change Proposal
This proposal from ADE seeks to ensure that all CMUs are able to transfer the entire volume of their capacity obligation to another CMU. ADE believes that the existing wording of Rule 9.2.4 may limit the ability of DSR and embedded generation to do this.