Balancing and Settlement Code (BSC) P266 Improving the allocation of Reactive Power flows between Import and Export Metering Systems
Correspondence and other
The proposal allows more suitable allocation of reactive power flows at shared sites (import and export at the same site) so that reactive power flows are allocated to the party responsible for the active power flow.